Estimates & quotes
What to do when a client wants to negotiate your quote
Change the scope, not the number. Dropping the price teaches the client the first figure was invented.
When a client asks for a lower price, the wrong answer is "fine, I'll do it for less". You have just told them your pricing is arbitrary, and the same conversation will happen on every job.
The right answer adjusts what they get: remove a room, use a cheaper fitting, drop the second coat, stretch the timeline to fit around better-paid work. Now the discussion is about value, and your rate survives intact.
Sometimes the honest answer is that you are not the right supplier for their budget. Saying so early is cheaper than discovering it halfway through.
Find out what "too expensive" means
It almost always means one of four things, and they need different answers.
- Above their budget. Real constraint. Reduce scope, not price.
- Higher than another quote. A comparison problem, usually of different scopes.
- More than they expected. An education problem about what the work involves.
- A reflex. Some people always ask. A calm hold usually ends it.
One question separates them: "Is it the total that's the problem, or is it more than you were expecting for the work?" The answer tells you whether to change the job or explain it.
Reduce scope, not price
Cutting the price teaches the customer your first number was inflated, and it makes every future quote a starting bid. Removing something is different — it keeps your rate intact and makes the trade-off visible.
"I can bring it to £2,900 by leaving the second coat on the hallway, which we could do separately later." Now the discount has a reason, your pricing stays credible, and the customer makes an informed choice.
When you are being compared to a cheaper quote
Ask to see it, or ask what it includes. Most of the time the gap is scope rather than rate: no preparation, no waste removal, no certification, cheaper materials, no guarantee. Comparing like for like usually closes most of the difference.
Do not disparage the other tradesperson. "That sounds about right for the work as they've scoped it — mine includes X and Y, which is where the difference is" wins more jobs than any criticism of a competitor.
Things to offer that are not a discount
- Payment structure. Staging payments costs you nothing and solves a genuine cash-flow problem for them.
- Timing. A date that fills a gap in your diary is worth a real reduction to you and feels like a favour to them.
- Phasing. Do the essential part now, the rest later. Two smaller jobs at full rate beats one discounted one.
- Customer-supplied materials. Reduces your total without touching your labour rate — though say clearly that you cannot guarantee materials you did not supply.
Holding your price
If the quote is right, say so once, without apology or over-explanation: "That's what the job takes, I'm afraid — I've priced it as tightly as I can." Then stop talking. The urge to fill the silence with a concession is what loses the margin, and it is almost always the seller who breaks first.
Know which jobs to let go
A customer negotiating hard before any work has happened will negotiate harder about the invoice. Someone who wants 20% off at quote stage is telling you what the payment conversation will be like. There is a price below which a job is not worth having, and walking away from it politely is a legitimate business decision rather than a failure.
Free, unlimited, no ads and no account. Get EstimateBill — or try the free browser invoice generator with nothing to install.